Medical tray wrapping machine
FIZE Medical
An automated machine that spreads a drape sheet, feeds the tray, folds the sheet on all four sides and seals the wrap with a sticker.
David Cherfus, Mechanical Engineer (B.Sc.)
We design and develop products, mechanisms and automated machines, from the first sketch to production.
Selected clients



We take an idea or an engineering problem and carry it through to a product that can be manufactured.
The work starts with defining the need and the concept, continues through detailed mechanical design and prototyping, and ends with a design that is ready for production. You can work with us on a full project or on a single stage: product development, a machine for a production line, or a specific problem in an existing system.
The work is led by David Cherfus, a mechanical engineer (B.Sc.) who has worked in industry since 2008. Clients include industrial companies, technology companies and startups.
Work with us on a full project or on part of one.

From an idea to a working product: mechanical design in CAD, 3D printed prototypes, and adapting the design for series production (DFM).
Learn more
Custom machines, production lines and packaging systems that replace repetitive manual work and shorten cycle times.
Learn more
A mechanical engineer who joins your development team for a project, a busy period or a problem that needs solving, without a hiring process.
Learn moreThe reviews a development project goes through on the way to series production. At the end of each one, you decide whether to move on. Each stage has its own article.
Defining the project scope, deliverables and expectations before design starts
Checking that the requirements are clear, feasible and ready to serve as the basis for development
The requirements take shape and the concept becomes a preliminary mechanical design
Moving from concept design to a detailed engineering design that is ready for production
Building a prototype and testing it against the design
Checking that the product, manufacturing, purchasing, quality and documentation are ready for full production
Initial production that tests whether the product and the process are ready for repeatable manufacturing
Development ends and series production begins
Machines and products we designed and developed for clients.

FIZE Medical
An automated machine that spreads a drape sheet, feeds the tray, folds the sheet on all four sides and seals the wrap with a sticker.

Bluran
A machine that bonds integrated handles to cabinet fronts across a wide range of sizes. It adjusts itself to each size without stopping the line.
compared with about 20 minutes per front by hand
Full case study
Centrefy
A device that dispenses tablets on a schedule. Inside it: a mechanism that selects between several magazines, an electromechanical housing, and a camera that confirms the medication was taken.
Full case studyDavid designed and developed several complex automated machines for our company with very challenging design requirements. Throughout the entire process, David demonstrated exceptionally high engineering professionalism, thoroughness, and meticulous attention to detail, all while adhering to constraints regarding price, machine size, cycle time, etc. Our collaboration was managed excellently through periodic status meetings. Whenever a challenge arose requiring discussion, David scheduled a meeting to present the challenge along with multiple potential solutions. We analyzed the technical challenges together, brainstormed creative solutions, and David always translated this thinking into precise and efficient engineering execution. David is pleasant, open-minded, brings a true commitment to results, and possesses an exceptional ability to take an engineering idea and turn it into reality. I warmly recommend him to any development team looking for a true professional for challenging projects.
Obviously, minimizing the space required by our electronic components is a major issue. We are working with David Cherfus since 2023. David designed for us 4 generations of prototypes and 3D-printed them. Discovering David and working with him was (and is still going) a success story. David created great designs and 3D-prints, he even came with ideas how to rearrange our electronic components to require less space.
In developing our venture, an advanced AI tool for manufacturing cost estimation and drawing analysis, David is our engineering anchor. As a team coming from a software background, we desperately needed an expert by our side who deeply understands the world of machinery, drawings, and manufacturing. David accompanies us on an ongoing basis as the project's engineering knowledge source. He brings immense experience, a deep understanding of manufacturing processes, and an impressive ability to translate complex engineering processes into the logic upon which our system is built. Thanks to his guidance and consulting, our product has become precise and hits the industry's exact needs. Beyond uncompromising professionalism, working with David is always precise, thorough, and pleasant. I warmly recommend him for any engineering or technological project!
A few words about what needs solving, and we will get back to you.