Cherfus Engineering Contact

Centrefy

Smart Medication Dispenser

Mechanical development of a dispenser that releases tablets on a schedule, for Centrefy.

The Centrefy smart medication dispenser
Client
Centrefy
Field
Product development
Users
Chronic patients and seniors

The challenge

Centrefy developed a dispenser that delivers medication to chronic patients and seniors. It has to release a single tablet or several tablets on a preset schedule, and confirm that each dose was dispensed exactly as planned and on time.

A computer and a camera had to fit inside a compact enclosure. The camera also verifies that the patient actually took the medication.

The solution

Dedicated tablet magazine

We designed a magazine that prevents double dispensing, so only the set amount comes out.

Magazine selection mechanism

We developed a separate mechanical mechanism that moves between several magazines and selects the right one according to the schedule and dosage.

Housing

We designed a mechanical enclosure that holds the computer, the built-in camera and the drive systems.

The result

One compact unit that dispenses tablets by schedule and dosage, selects between several magazines and uses its camera to verify that the medication was taken.

Need a similar solution?

Tell us what needs solving, and we will get back to you.