The challenge
FIZE Medical needed an automatic machine to wrap filled trays in a drape sheet. The machine had to run the whole sequence on its own, from a flat sheet to a wrapped and sealed tray.
- Spread the drape.
- Feed the tray into the folding area and fold the sheet on all four sides.
- Seal the wrap with a sticker.
The solution
Drape feeding and spreading
The sheet is pulled from the drape magazine onto the spreading fixture. Spreading is done with vacuum and a gravity mechanism.
Tray handling and wrapping
A FAIRINO-FR5 6-axis robot with interchangeable grippers handles the tray. The robot folds the sheet around the tray on all four sides and applies the sticker that seals the wrap.
- Pull the sheet from the magazine onto the spreading fixture.
- Spread it with vacuum and a gravity mechanism.
- Feed the tray into the folding area.
- Fold on four sides with the robot.
- Apply a sticker to seal the wrap.
The result
The machine runs at 40 trays per hour.



