Cherfus Engineering Contact

Engineering Outsourcing

A mechanical engineer who joins your team for a project, a busy period or a defined task, without a hiring process.

Engineering drawings and a 3D model on a desk

Need a mechanical engineer for a while?

Tell us

Another engineer, without adding headcount

Hiring an engineer is a big decision, and it does not always fit a temporary need. Sometimes the team needs more hands now: to meet a deadline, get through a busy period or move a stuck task forward.

We define the scope of work together, and we work alongside your team on design and problem solving, in coordination with your engineers.

When it fits

Temporary workload

A busy period, several projects at once, or a task with a deadline.

Defined task

Designing an assembly, updating a design, drawings or a focused problem, with agreed deliverables.

Expertise your team lacks

Specific mechanical know-how that you do not need full time.

Flexible scope

The scope changes with the progress of the project, with no commitment in advance.

When the need is permanent and broad over time, hiring an employee is usually better. It depends on the nature of the tasks and how long the need lasts.

How we work

  1. Defining the task

    We define the problem or tasks, the schedule, the deliverables and the contact people on your team.

  2. Getting to know the team

    We learn the product, the existing design and the way you work, and move forward in coordination with the team.

  3. Design and problem solving

    Mechanical design, adapting existing assemblies, feasibility checks, manufacturing and assembly problems or documentation, as defined.

  4. Handover

    We hand over the agreed files and documentation, and define the next steps together.

Where we can help

Mechanical design and development

Assemblies and mechanisms, updating models and drawings, evaluating alternatives and improving an existing solution.

Problem solving

Faults in function, in the fit between parts, in assembly or in manufacturing.

Preparing for production

DFM/DFA adjustments, completing documentation and handling problems that come up during build, commissioning or the move to production.

Tell us what you need

What the task is, what the scope is and when. We will get back to you.