Articles: Product Development Stages
The eight reviews a development project goes through on the way to series production, and what each one checks.

-
Stage 1 of 8

SOW: Defining the Scope of Work
The document that defines what will be built, what will be delivered, when and on what budget, and serves as the reference point for both sides throughout the project.
-
Stage 2 of 8

SRR: System Requirements Review
The review that confirms the requirements derived from the SOW are complete, clear, verifiable and feasible before development begins.
-
Stage 3 of 8

PDR: Preliminary Design Review
The stage where approved requirements become initial 3D models, with design alternatives, material selection and risk identification before detailed design.
-
Stage 4 of 8

CDR: Critical Design Review
The stage where the design gets final dimensions, tolerances, production drawings and a full BOM, and is checked for manufacturing, assembly and maintenance before prototyping.
-
Stage 5 of 8

PBR: Prototype Build Review
The stage where the approved design is built as real parts, to confirm it can be manufactured, assembled and operated before moving toward production.
-
Stage 6 of 8

PRR: Production Readiness Review
The review that confirms manufacturing, purchasing, quality and documentation are ready for series production, beyond a working prototype.
-
Stage 7 of 8

Pilot: Pilot Production
A first, limited run that tests whether the product can be made again and again, with consistent quality, an orderly process and reasonable cycle times.
-
Stage 8 of 8

Release: Production Release
The stage where the product formally moves from development to ongoing production, once all documentation, processes, components and tests are updated and approved.