Bluran

Integral Handle Bonding Machine for Cabinet Fronts

A machine we designed and built for Bluran that bonds integral handles to cabinet fronts of any size.

Machine that bonds handles to cabinet fronts
Client
Bluran
Size range
Width 10 to 240 cm, height 15 to 120 cm
Throughput
About 60 fronts per hour
Before
About 20 minutes per front by hand

The challenge

Bluran needed a machine to bond integral handles to cabinet fronts across a wide size range: 10 to 240 cm wide and 15 to 120 cm high.

The doors arrive in no fixed order, and any size can come at any moment. The machine had to adjust to each front without stopping and without manual setup.

The solution

  • Automatic adjustment: sensors read the front's dimensions and the machine adjusts itself. There is no setup between one front and the next.
  • Continuous operation: the full size range can be loaded continuously, with no stops and no manual intervention.
  • Simple operation: the operator only feeds the front and the handle onto the conveyor up to a set point. The machine takes it from there, which keeps the process fast and safe.

The result

The machine runs at about 60 fronts per hour. With the previous manual method, each front took about 20 minutes. The line runs continuously, with no stops to adjust between sizes.